Living Areas
We can introduce new flooring, feature walls, ceilings, lighting, furniture and custom TV units to create a more contemporary living environment.
Guide
Updated 4 October 2026
A home renovation in Nairobi goes more smoothly when the planning is done before the first wall is touched. Knowing what you want to change, what the existing space allows and in what order the work should happen keeps the budget under control and reduces the risk of rework. This guide sets out the steps we follow in interior renovation and remodeling projects, from the first assessment to handover.
Whether you are updating one room or transforming a whole house, the same principles apply. The steps below follow the order in which decisions are usually made.
Start with the reasons for renovating, because they shape every later decision. Renovations usually aim at one or more of the goals below.
Write your goals down room by room. A clear brief makes it easier to compare options and to decide what can wait.
Separate needs from wishes. A bathroom that leaks or storage that no longer works is a need, while a new feature wall may be a wish that can wait for a later phase.
Before designing anything, the existing property needs a careful look. During the site assessment we identify existing finishes, services, structural considerations and areas requiring improvement.
Services such as plumbing and electrical points affect what is practical to move. Structural walls and openings may limit layout changes, and any alteration to them should involve the appropriate project professionals.
Take photos and measurements of each room as it is today. They help when comparing options and give a useful record of what was there before.
Set a budget range before design begins and keep a contingency for surprises. Older properties in particular can reveal hidden issues once finishes are removed.
Share the range with your designer early. It lets the design and the costing focus on what matters most to you, rather than producing a scheme that has to be cut back later.
If the budget does not cover everything, phase the work. Complete disruptive or hidden work first, and leave furniture and styling for later.
Different rooms call for different kinds of work. Setting priorities helps you decide where the budget will make the most difference.
We can introduce new flooring, feature walls, ceilings, lighting, furniture and custom TV units to create a more contemporary living environment.
A kitchen renovation can improve storage, workflow, cabinetry, worktops, lighting and overall functionality.
Bedroom remodeling can incorporate custom wardrobes, headboards, lighting, wall treatments and improved furniture arrangements.
We can update tiles, fixtures, vanity units, lighting and other finishes while improving the functionality of the space.
Often overlooked areas can be enhanced through lighting, feature walls, wainscoting, artwork, joinery and carefully selected finishes.
Kitchens and bathrooms usually involve the most trades, so they need the most planning. Bedrooms and living areas are often simpler to phase.
Walk through a normal day in the home and note where things go wrong. Those friction points are often the most valuable places to spend the budget.
Design decisions are far easier to change on screen than on site. Design concepts, moodboards and 3D visuals help communicate the proposed transformation before implementation.
Renovation visuals can show proposed layouts, furniture arrangements, flooring, wall finishes, ceiling designs, lighting and custom cabinetry. Seeing them together helps you judge whether the changes work as a whole before anything is removed.
Use this stage to test alternatives. Comparing two layouts or two colour schemes side by side is far cheaper than changing direction after work has started.
With the design agreed, materials and finishes can be selected for each space. This typically covers flooring, wall finishes, cabinetry materials, lighting, sanitary fixtures, fabrics and other finishes.
Choose finishes with maintenance in mind as well as appearance. A finish that suits a bedroom may not suit a busy kitchen or bathroom.
Floors are a good example, since the right finish depends on how each room is used. Ceilings are another, because a new ceiling with integrated lighting can modernize a room without changing its layout.
Ask for physical samples where possible and look at them in the room's own light. Colours and finishes can look very different under daylight and artificial lighting.
Renovations involve several specialists working at different stages. Poor coordination can lead to delays, rework or conflicts between installations. The trades that usually need coordinating are listed below.
The objective is a logical sequence of works, so that hidden services are in place before ceilings close and finished floors are protected while joinery goes in. Our project management and interior construction service coordinates this sequence from the approved design through to completion.
Agree who coordinates the trades before work starts. When one team is responsible for the sequence, problems tend to be spotted and resolved earlier.
Many renovation problems start with decisions taken in the wrong order. These are worth avoiding.
You can renovate one room at a time or the whole house at once. Working room by room keeps most of the home usable and spreads the cost, but it can take longer overall and means living with work in progress.
A whole-house renovation is usually simpler to coordinate, since trades can move through the property in one sequence. It may mean moving out for part of the work, so plan where you will stay.
If you stay in the home, agree which rooms remain usable and how dust and noise will be managed. Clear expectations on both sides make the process far less stressful.
At the end, completed works are reviewed, finishing details are addressed and the space is prepared for use. Walk through each room with your designer, test fittings and lighting, and note anything that needs attention.
Agree how any remaining snags will be handled before the final handover. A short written list keeps everyone clear on what is left to do.
Keep a record of the finishes and materials used in each room. It makes future repairs and touch-ups far simpler.
Our renovation process follows the same order as the steps above. Each stage is agreed before the next begins.
We begin by understanding your goals and assessing the existing property. We identify existing finishes, services, structural considerations and areas requiring improvement.
We establish how the space should function and identify opportunities to improve layouts, circulation, storage and usability.
Design concepts, moodboards and 3D visuals help communicate the proposed transformation before implementation.
We select appropriate flooring, wall finishes, cabinetry materials, lighting, sanitary fixtures, fabrics and other finishes.
The required works are reviewed and organized into a practical implementation plan based on the approved scope.
The renovation works are coordinated according to the approved design, scope and project requirements.
Completed works are reviewed, finishing details addressed and the space prepared for use.
Yes. We can work on individual spaces such as kitchens, bathrooms, bedrooms, living rooms or offices.
Yes. Depending on the project, we develop 3D concepts to help clients visualize the proposed transformation.
Yes. Existing furniture can be incorporated where it suits the new design, while additional or custom pieces can be introduced where required.
Yes. We can coordinate the design and renovation of multiple spaces as part of a complete home transformation.
Single rooms to complete properties transformed through better layouts, new finishes, cabinetry, ceilings and lighting.
Planning a renovation? Contact Epique Interiors to arrange a consultation and site assessment for your home.